Showing posts with label Early Anthracite Railroads. Show all posts
Showing posts with label Early Anthracite Railroads. Show all posts

Sunday, December 10, 2023

The Little Schuylkill & Susquehanna Railroad (Original Catawissa Railroad)

The Catawissa Canal and the Conversion to a Railroad

The Little Schuylkill & Susquehanna Railroad (LSSR) began its existence as a potential canal.  In 1822 a prominent resident of village of Catawissa, Pennsylvania, Christian Brobst, proposed a canal be constructed up Catawissa Creek to its headwaters.  The plan was to meet the headwaters of the Little Schuylkill River, about 3 plus miles away. Another canal would be constructed in the Little Schuylkill River to Port Clinton, where it would join with the Schuylkill Canal and Navigation to Philadelphia.  Brobst, although not an engineer, proceeded to himself conduct a survey in 1825 of the proposed Catawissa Canal with home-made instruments. 

The plan went "nowhere".  The difficulty of digging a three mile canal (to connect the two rivers) through mountainous terrain was one example of the difficulties.  However, Brobst used his Catawissa Canal project to get elected to the Pennsylvania State Legislature in 1827. In the period between 1827 and 1829, in the first and second coalfields, the preferred mode of transportation was shifting from canals to railroads.    Five proposed canals or navigations now emerged as railroad companies:

  • Mill Creek & Mine Hill Navigation and Railroad Co., incorporated on February 7,1828, remained as such,
  • Schuylkill Valley Navigation Company, incorporated March 20th, 1827, became the Schuylkill Valley N. & R. R. Company, on April 14,1828,
  • Schuylkill West Branch Canal, of March 29th, 1819, became the Mine Hill & Schuylkill Haven R. R., on March 24,1828,
  • Schuylkill East Branch Navigation Co., of February 20, 1826, became the Little Schuylkill Navigation, Railroad & Coal Co., April 14,1828 (this was the proposed connection of the Catawissa works to the Schuylkill River at Port Clinton), and
  • Norwegian Creek Slackwater Company, of April 14, 1827, became the Mt. Carbon R. R., April 29,1829.

Brobst now advocated a railroad through the Catawissa Valley.  Brobst persuaded Stephen Girard, Philadelphia banker and capitalist, and Moncure Robinson, engineer for the Pennsylvania Canal Commission and an accomplished railroad engineer, to tour the route where they were favorably impressed.  The Legislature authorized a professional survey for this railroad.  Robinson supervised this survey. 

Discussion of this route versus the Danville and Pottsville Railroad (which also proposed connecting the Susquehanna and Schuylkill Rivers) occurred immediately after both official surveys were released, in 1827, of the two potential routes by Robinson . Robinson reported that the LSSR route was suitable for locomotive power to the summit, but also to reach the Little Schuylkill (at that time) inclined planes would be necessary - those for the Catawissa line saw the locomotive statement; those against it, the need for planes. Robinson also noted that the route was the most direct route from the North Branch (of the Susquehanna Rover) to Philadelphia and, via the Quakake Creek, a direct route to the Lehigh Canal and to New York City—would command a more extensive trade than any other between the North Branch of the Susquehanna and the Delaware.

The view from Catawissa town east towards the headwaters of the creek. From Harper's Monthly 1862.

Construction of the LSSR

On March 31, 1831, the legislature granted a corporate charter to the LSSR. The railroad was eventually built following the line that Brobst surveyed in 1825. In addition to that western line (from at or near Catawissa to Tamanend, a junction of the Little Schuylkill Railroad), an eastern portion of line was to be constructed from Quakake to the Beaver Meadows Railroad, with connections using the Lehigh Company Railroads and Canals to the Morris Canal and thence to New York, as Moncure Robinson had envisioned.  This eastern portion was called the Lehigh Branch. Contemporaneous books and documents indicate that the connection to the Little Schuylkill Railroad was to occur at Lindner's Gap, a cut in the Broad Mountain, near Ginthers and not at Tamanend.  Tamanend only became prominent as a railroad connection more than two decades later when the Mahanoy Tunnel opened up the Second Coal Field to the east.

Work began on the LSSR in 1835 and continued for several years.  The banking panic of 1837 restricted the investment required and the LSSR was only partially completed (the Lehigh Branch). 

However a significant amount of work was undertaken and performed throughout the western part of the line. Two tunnels were dug - the 400-ft. Shuman's Tunnel and a year later, the 1,150-ft. Summit Station (Lofty) Tunnel.  Seven bridges, totaling over 4,000 feet in length, and varying in height from 90 to 130 feet above grade, were partially constructed.  The system of tunnels and bridges allowed for a uniform grade of about 30 feet per mile to Lofty.  The Little Schuylkill Railroad (already in operation from November 18, 1831) had also built but only one mile of its route to Tamanend from Tamaqua, a total distance of about eight miles. A 66-ft. per mile grade was required on the three miles to Tamanend Junction and a third tunnel was required at Ryan's Cut. These remained uncompleted.   

The Lofty Tunnel, photo by John Moran.  Tunnelling work completed during construction of initial Catawissa Railroad in 1835-41 (New York Public Library)

However as noted above, the Lehigh Branch was partially completed. This railroad branch was then operated by the Beaver Meadow Railroad between Black Creek Junction on the Lehigh River and Quakake. This completed part of the Lehigh Branch of the LSSR at Quakake Valley was 165 feet below the Catawissa-Little Schuylkill level at Ryan's Cut at Lindner's Gap. Contractors had managed to grade this before in 1840 but in 1840 only twenty-seven tons of coal passed over this Lehigh Branch to the Beaver Meadow Railroad from LSSR coal lands. Then the Lehigh flood of 1841 occurred and ended transportation on both the Beaver Meadow Railroad and the Lehigh Canal for a substantial period. When the financial depression of 1841 occurred, the LSSR had expended over $1 million on its project, but only the Lehigh Branch had been marginally operational for about a year. It was not rebuilt. 

Much like its competitor between the Susquehanna and Schuylkill, the Danville and Pottsville Railroad, the LSSR sat for over a decade in an unfinished condition; bridges, partially constructed, decayed and fell down, walls and embankments crumbled and became useless.  It would not be until 1849 that the LSSR would re-organize as the Catawissa Williamsport & Erie Railroad (CW&E).  In 1853, the CW&E would then successfully complete the Catawissa to Tamanend route to connect to Philadelphia and to also re-establish the Lehigh Branch to connect to New York as planned two decades earlier.

Bibliography

Hard Coal Times, (2005), CoalHole .com, Bloomsburg, PA.

Hydinger, Earl J., Group Vl, The Little Schuylkill, THE E. M.; L. S. & S.; CATAWISSA; T. H. & N.; D. S. & S., RLHS Bulletin  Vol 108,  April 1963

Roberts, Jeanne B. & Albright, Rev. John R. (editors), A History of Catawissa Pennsylvania, 200th, Anniversary, Lititz, PA, 1974 

 

 

 



 

 

Tuesday, June 27, 2023

The Danville & Pottsville Railroad

On April 8, 1826, the Pennsylvania legislature passed an act which incorporated the Danville & Pottsville Railroad (D&P) and also granted it the right to own 1,000 acres of coal lands.  One purpose of the proposed D&P was to open the Shenandoah and Mahanoy valleys (also known as the second, or middle, coalfield), extract the coal from the lands, and then connect to existing transportation infrastructure (the Schuylkill Canal) via a tunnel at Wadesville. The project was the idea of several Pennsylvania businessmen including Stephen Girard of Philadelphia also a banker, Burd Patterson of Pottsville (both with interests in the second coalfield) and Daniel Montgomery Jr. of Danville. Secondarily, the railroad was also to link the Susquehanna and Schuylkill rivers allowing anthracite coal, iron, and timber to be transported in large quantities to established and growing markets along the Susquehanna River as well as the existing transportation infrastructure to Philadelphia via the Schuylkill River.This latter purpose was also an idea shared by Christian Brobst of Cattawissa who was planning a separate route from Catawissa to Port Carbon on the Schuylkill River, later to become the Little Schuylkill & Susquehanna Railroad (LSSR).

Route map for the D&P from 1827, showing tunnels and planes required (by Moncure Robinson)

Moncure Robinson who was employed by the Pennsylvania Canal surveyed both routes. He found merit in each project but was hired by the D&P to implement its project.  The project suffered a setback when both Montgomery and Girard died in 1831. Notwithstanding this, the work began in December 1831.

The construction plan envisioned the railroad being built in sections. Commercially, in the interest of producing immediate revenue, work on the eastern end of the railroad at Wadesville where there was to be a connection with the Mt. Carbon Railroad, which already had extended north to Wadesville, was to begin first.

The tunnel near Wadesville was apparently the second railroad tunnel constructed in America when it opened in 1833. On September 24, 1834, the opening of this eastern section took place with six self acting planes including the 345-foot-high original Mahanoy Plane. Both Robinson and his wife rode over these planes to demonstrate the reliability of the design and construction. However, no coal was being mined until a coal seam was opened on the northern side of Bear Ridge. But by 1837 the original coal seam ran out and another mine tunnel was planned to be extended to what was believed to be the Mammoth Vein.  This became known as the Girard Tunnel.  However, funds to develop the tunnel became scarce (and a subsequent business depression - The Panic of 1837 - occurred) and work was completely stopped. It would not be until 1857 that work on the Girard tunnel resumed and the Mammoth Vein would be discovered more or less where it was believed to have been in 1837.

During 1837, work proceeded on the remaining western section of the road, and on August 15, 1837, this section was opened. The western section extended from the Susquehanna River at Sunbury (not Danville as originally planned) and ended to the Shamokin coalfields, also part of the Second Coal Field. Several years later this line was extended to Mt. Carmel.

The Banking Panic of 1837 created financial difficulties and the project never completed the gap of about 20 miles that would have connected the two ends.  Moreover, the Girard trustees deferred opening up the coal lands in Girardville (the eastern end of the railroad) and that entire portion of the project was abandoned, despite having already been built.  In this regard the D&P was similarly situated as the LSSR (i.e. the original Catawissa Railroad). That railroad also abandoned its partially built line between Catawissa and Tamanend. However, the western portion of the D&P line was able to recover and operated marginally for over a decade. 

The railroad’s precarious finances - including bankruptcies in 1849 and 1857 - prevented profitable operations. On April 12, 1851 the D&P reorganized  as Philadelphia & Sunbury Railroad and then in 1858 as the Shamokin Valley and Pottsville Railroad Company.

Bibliography

Baer, Christopher T., A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT 1831, May 2015 Edition

Baer, Christopher T., A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT 1834, May 2015 Edition

Baer, Christopher T., A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT , 1851, March 2005 Edition

Bell's History of Northumberland Co PA, Local History, Brown Runk & Co., Chicago, 1891

Hard Coal Times, CoalHole.com Bloomsburg, PA., 2005

Heydinger, Earl J., The Railway and Locomotive Historical Society Bulletin, No. 107 (OCTOBER 1962), Railway & Locomotive Historical Society

Heydinger, Earl J., GROUP VIII. Railroads of the Lehigh Valley - Pennsylvania Railroad Groups,   The Railway and Locomotive Historical Society Bulletin No. 109 (OCTOBER 1963)

Hoffman, John N., Girard Estate Coal Lands In Pennsylvanis 1801-1834, Smithsonian Institution Press:Washington DC (1972)

Pottsville Republican, Pottsville Pennsylvania, Stephen Girard, the Pioneer Anthracite Operator, 07 Oct 1914


.

 


The Long Strike of 1875 (and the rise of the Molly Maguires)

This was a labor strike by anthracite coal miners in northeast Pennsylvania which led to the dissolution of the first truly effective miners...